PROJECTS

Structured Cabling Projects

How cable is planned, installed and measured in a new building or a renovation, using a typical project as the example.

Structured Cabling Projects — 5A Teknoloji

This page does not describe a specific customer. It sets out how a structured cabling project usually goes.

Typical need

A newly built hotel, office or factory needs network points. Or a renovation has changed the number of floors and rooms. The old cabling is inadequate, unlabelled and hard to trace when something fails. Campus-style sites that need fibre links between buildings also belong here.

Our approach

We mark the number and position of points on the floor plan together with you, allowing for the cable route, the cabinet location and points you may add later. Installation runs floor by floor, following the construction or renovation schedule. Every point is connected, labelled and tested. For copper points we record the test-tool results; for fibre, the optical measurements.

Deliverables

  • Labelled copper and fibre points
  • Test results per point
  • Point markings on the floor plan
  • Patch panel and switch connection list
  • List of materials used

Timeline

A renovation with few points finishes in a few working days; a building with hundreds of points takes a few weeks. The construction timetable mostly decides our schedule. We tell you at each stage what is being done, and we try not to cause outages while your business is running.

Let’s plan your infrastructure together

Let us listen to what you need and prepare the right solution and quote for you.